Altus Release Notes

Updates to Altus are deployed in sequence through a series of environments; Canary, 1st Release and General Availability. This allows the updates to be tested prior to applying them to customer environments.

Image shows the release rings strategy diagram

The table below shows the current status of each release ring:

Solution 🚂 (Weekly) Canary release 🚂 (Fortnightly) First release 🚂 (Fortnightly) GA
Altus logo ControlsV1
Reusable Components
Sensei.D365.SenseiControlsV1 package in Coruscant@Local feed in Azure Artifacts Sensei.D365.SenseiControlsV1 package in Coruscant@Prerelease feed in Azure Artifacts Sensei.D365.SenseiControlsV1 package in Coruscant@Release feed in Azure Artifacts
Altus logo Kaizen
Base Tables and Forms
Sensei.D365.SenseiProject package in Coruscant@Local feed in Azure Artifacts Sensei.D365.SenseiProject package in Coruscant@Prerelease feed in Azure Artifacts Sensei.D365.SenseiProject package in Coruscant@Release feed in Azure Artifacts
Altus logo Atsumeru
Application Logic
Sensei.D365.SenseiProjectIndependent package in Coruscant@Local feed in Azure Artifacts Sensei.D365.SenseiProjectIndependent package in Coruscant@Prerelease feed in Azure Artifacts Sensei.D365.SenseiProjectIndependent package in Coruscant@Release feed in Azure Artifacts
Altus logo Kusanagi
Copilot and AI
Sensei.D365.SenseiAltusCopilot package in Coruscant@Local feed in Azure Artifacts Sensei.D365.SenseiAltusCopilot package in Coruscant@Prerelease feed in Azure Artifacts Sensei.D365.SenseiAltusCopilot package in Coruscant@Release feed in Azure Artifacts
Altus logo Oldest Supported Version Canary FR GA

The schedule of release will be adhered to with the exception of Coolfixes, Warmfixes and Hotfixes, which can be applied to an environment on an accelerated schedule. Each fix has an Impact Rating which indicates the possible impact on customisations and the level of testing recommended before deployment.


2025.12.02.2

  • Atsumeru - 2025.12.02.2
Environment Release Date Status
🚂Canary 9 Dec 2025
🚂First Release 23 Dec 2025
🚂General Availability 6 Jan 2026
 
Item Description
Bug #37536
Resolved an issue with External Tasks not deleting correctly in some circumstances.

Enhanced performance in the Jira task sync Dataflow template.
🟢Low

2025.12.08.5

  • ControlsV1 - 2025.12.08.5
Environment Release Date Status
🚂Canary 9 Dec 2025
🚂First Release 23 Dec 2025
🚂General Availability 6 Jan 2026
 
Item Description
Bug #36318
Resolved an issue where dates synced from Planner Premium to Altus were off by one day due to mismatched time zones. The sync process now correctly accounts for time zone differences, ensuring accurate scheduling throughout Altus.
🟢Low
PBI #38655
Increased zoom level presets for Optimisation to include multiple years and configured the zoom in and out buttons to disable once minimum/maximum zoom is reached.
🟢Low
Bug #38696
Resolved an issue where the Save button on the grid was disabled when locking external tasks. Users can now save the lock status directly from the grid, streamlining the workflow and improving usability.
🟢Low
Defect #39316 Altus Tasks - Baseline bars are not displayed on refresh of the sub-grid ⚪Unknown
Defect #39364 Locked Task Banner shows up on Saving a Timesheet ⚪Unknown
NFI #39415
N/A
⚪Unknown

2025.12.02.3

  • Atsumeru - 2025.11.25.2
  • ControlsV1 - 2025.12.02.3
Environment Release Date Status
🚂Canary 2 Dec 2025
🚂First Release 9 Dec 2025
🚂General Availability 23 Dec 2025
 
Item Description
Bug #36567 Addressed an issue where the resource plan tab experienced long load times, even for small plans. Optimizations have been implemented to significantly improve loading speed and enhance user experience. 🟡Medium
Bug #37332 Resolved an issue where the Delete Protection page was not correctly displaying multiple space characters when more than one was present in the name of the item the user had selected to delete. 🟢Low
Bug #37621 Timesheets: Rectified an issue where users could submit timesheets with hours logged against locked tasks. Now, timesheets cannot be submitted until all entries against locked tasks are removed, ensuring data integrity and compliance. 🟢Low
Bug #38662 Fixed an issue where baseline bars were not displayed after reloading the grid. Now, baseline bars remain visible and the selected baseline stays highlighted after a page refresh, ensuring consistent project tracking. 🟡Medium
PBI #38741 The navigation label for “My Timesheet” has been updated to “Current Timesheet” for clarity, and a new “My Timesheets” button has been added to the ribbon. Providing a shortcut to access to all the users timesheets. 🟡Medium
PBI #38916 Altus Copilot now recognises user queries using familiar or alternate terminology for key entities, thanks to new synonyms and glossary support. This enhancement reduces reliance on specific field names and makes interactions more natural and user-friendly. 🟢Low
Bug #39128 Altus Tasks: Addressed an issue whereby moving a task to a Done bucket might not set percent complete to 100% in some circumstances. 🟢Low
Bug #39206 Resolved an authentication issue in Altus for Teams where users with environments containing hyphens and ending in ".crm.dynamics.com" could not create project groups. The validation logic was updated to correctly handle these domain formats, ensuring seamless group creation for all supported environments. 🟢Low

 


🌞 WARMFIX: 2025.12.01.18

  • ControlsV1 - 2025.12.01.18
Environment Release Date Status
🚂First Release 2 Dec 2025
🚂General Availability 23 Dec 2025
 
Item Description
Bug #39319 Added missing form event handler to ensure smooth Status Update experience. 🟢Low

 


2025.11.18.23

  • Atsumeru - 2025.11.13.1
  • ControlsV1 - 2025.11.18.23
  • Kusanagi - 2025.11.18.2
Environment Release Date Status
🚂Canary 25 Nov 2025
🚂First Release 9 Dec 2025
🚂General Availability 23 Dec 2025
 
Item Description
PBI #35700 We have simplified the creation of Evaluation Criteria in SPM Prioritisation - now we allow entry of negative values and positive values into a given Evaluation Criteria. These will be coloured in their corresponding Red and Green, these colours will be reflected all the way through to Prioritisation Plan where the selected colour will be updated. The change also updates how scores are represented on the Score tooltip it now sums up the values in order they are added to the Plan. 🟡Medium
Bug #36567 Addressed an issue where the resource plan tab experienced long load times, even for small plans. Optimizations have been implemented to significantly improve loading speed and enhance user experience. 🟡Medium
Bug #37332 Resolved an issue where the Delete Protection page was not correctly displaying multiple space characters when more than one was present in the name of the item the user had selected to delete. 🟢Low
Bug #37621 Timesheets: Fixed an issue where users could submit timesheets with hours logged against locked tasks. Now, timesheets cannot be submitted until all entries against locked tasks are removed, ensuring data integrity and compliance. 🟢Low
Bug #38746 Resolved an issue where the Scheduling Cycle dialog would repeatedly appear when saving tasks with dependencies and summary/child relationships. When using the 'Deactivate dependency' option the form would repeatedly reappear and so we have removed the disable dependency option when there is a cyclic dependency. 🟡Medium
Bug #39128 Rectified an issue in Altus Tasks where Moving a task to a Done bucket would not set percent complete to 100% in some circumstances. 🟢Low

 


2025.11.18.21

  • ControlsV1 - 2025.11.18.21
Environment Release Date Status
🚂Canary 18 Nov 2025
🚂First Release 25 Nov 2025
🚂General Availability 9 Dec 2025
 
Item Description
Bug #35610 Modified the way we query Optimisation finance and gantt data to decrease load time of Scenarios and enable large Scenarios to load without query failure. 🟢Low
Bug #35613 In SPM Optimisation, resolved an issue where moving a large number of initiatives from IN to OUT caused a failure. When moving 10 or more Initiatives to IN or OUT, the user is now shown a loading message to visually represent that a change is happening while the request is processed. 🟢Low
PBI #35700 We have simplified the creation of Evaluation Criteria - now we allow entry of negative values and positive values into a given Evaluation Criteria. These will be coloured in their corresponding Red and Green, these colours will be reflected all the way through to Prioritisation Plan where the selected colour will be updated. The change also updates how scores are represented on the Score tooltip it now sums up the values in order they are added to the Plan. 🟡Medium
Bug #36620 Resolved an issue where dependencies with 'Start to Start', 'Start to Finish', or 'Finish to Finish' schedule types did not update the successor task's start date to match the predecessor. The logic has been corrected so that successor dates now update as expected when these dependencies are created. 🟡Medium
Bug #38656 Fixed an issue where the 'Disable Resource Assignment to Owning Group Synchronisation' setting did not function in Altus Tasks module, causing resources not to be automatically added to the project owner group. The synchronization now works as expected, ensuring consistent group membership management. 🟢Low
Bug #38657 Rectified an issue where date fields in Altus Tasks module required inconsistent formats for entry and display. All date fields now use a consistent DD/MM/YYYY format, ensuring users can enter and view dates seamlessly throughout the application. 🟢Low
PBI #38711 Introducing a new PCF control: Altus Copilot Field, allowing users to generate or edit text field values with context-aware summaries. This enhancement streamlines data entry and improves accuracy by leveraging AI assistance directly within model-driven apps. 🟢Low
Bug #38743 Resolved an issue where start dates for manually scheduled and auto tasks could not be updated via the Gantt chart. Users can now successfully update start dates directly in the Gantt view. 🟡Medium
Bug #38746 Fixed an issue where the Scheduling Cycle dialog would repeatedly appear when saving tasks with dependencies and summary/child relationships. When using the 'Deactivate dependency' option the form would repeatedly reappear and so we have removed the disable dependency option when there is a cyclic dependency. 🟡Medium
Bug #38805 Addressed an issue where users could not change the start date of a child task to an earlier date in Altus Tasks. The update now allows child task start dates to be adjusted as expected. 🟡Medium

 


🌞 WARMFIX: 2025.11.18.X

  • ControlsV1 - 2025.11.18.16 (First Release)
  • ControlsV1 - 2025.11.18.21 (Canary)
Environment Release Date Status
🚂Canary 18 Nov 2025
🚂First Release 18 Nov 2025
🚂General Availability 25 Nov 2025
 
Item Description
Bug #39094 Resolved an issue where changing the finish date of tasks in Altus Tasks did not behave as expected in some circumstances, causing inconsistencies in date and duration. The update ensures finish dates and durations now update accurately when edited. 🔴High

 


2025.11.04.7

  • Atsumeru - 2025.11.04.6
  • ControlsV1 - 2025.11.04.7
Environment Release Date Status
🚂Canary 12 Nov 2025
🚂First Release 25 Nov 2025
🚂General Availability 9 Dec 2025
 
Item Description
Bug #35610 Modified the way we query Optimisation finance and gantt data to decrease load time of Scenarios and enable large Scenarios to load without query failure. 🟢Low
Bug #35613 Rectified an issue in SPM Optimisation feature where moving a large number of initiatives from IN to OUT caused a failure. When moving 10 or more Initiatives to IN or OUT, the user is now shown a loading message to visually represent that a change is happening while the request is processed. 🟢Low
Bug #36343 Resolved an issue where project registers (i.e. Risks, Deliverables etc.), when created outside the project views, did not inherit the ownership from the assigned project. This fix ensures that all project registers records now correctly align with the project owner, ensuring visibility and access for users. 🟢Low
Bug #37547 Fixed some issues with Resource Role row selection in SPM Optimisation. 🟢Low
Bug #37560 In SPM Optimisation, ensured that Resource based filters are cleared when closing Resourcing or switching to view Finances. 🟢Low

 


2025.11.04.4

  • Atsumeru - 2025.11.04.4
  • ControlsV1 - 2025.10.31.13
Environment Release Date Status
🚂Canary 4 Nov 2025
🚂First Release 11 Nov 2025
🚂General Availability 25 Nov 2025
 
Item Description
PBI #30600 Altus Home Page

We are excited to introduce the new Altus Home Page, designed as a streamlined, user-focused entry point to help you start your day with clarity and efficiency. At the heart of this update is the My Work widget, giving you a consolidated view of your tasks: overdue, due today, and upcoming, all in one place.
This release replaces the existing Altus homepage and brings improved navigation, faster access to work items, and configuration options for custom registers.

Find the config link here.
See this in Product board.

Let us know if you have any feedback.
🔴High
PBI #30900 New Altus Scheduling Engine

We are introducing a new scheduling engine in Altus that significantly improves the user experience for creating and managing task lists. While existing features like baselines and importing actuals from timesheets remain fully supported, this update focuses on making scheduling faster and more intuitive. The new Altus Tasks module enables inline editing, so you can update tasks directly without opening separate dialogs, and offers a cleaner, more responsive interface that makes building task lists quicker than ever before. These enhancements reduce clicks, streamline workflows, and deliver a modern, efficient scheduling experience.

See this in Product board.

Important: If your organisation uses Altus solution with customisations, please ensure to perform sufficient testing before implementing this update to Production environment.
🔴High
PBI #34104 We are rolling out Improved Navigation in Altus to deliver a cleaner, more intuitive experience across the platform. This update introduces a simplified menu structure that consolidates key areas: Work, Projects, and Portfolios, into a unified Initiatives section, reducing clutter and making it easier to find what you need. The refreshed navigation also removes redundant links, streamlines access to Strategy and Resources, and ensures a consistent layout across devices. These changes are designed to help users stay oriented, minimise clicks, and improve overall productivity.

See this in Product board.
Check out these videos for users and administrators to understand more about the new Home Page and Improved Navigation.
🔴High

 


🌞 WARMFIX: 2025.11.04.X

  • Atsumeru - 2025.11.04.3 (First Release)
  • Atsumeru - 2025.11.04.4 (Canary)
Environment Release Date Status
🚂Canary 4 Nov 2025
🚂First Release 4 Nov 2025
🚂General Availability 11 Nov 2025
 
Item Description
Bug #38737 🌞 A bug was discovered that deletion of a task in some external systems (i.e., Jira/Azure DevOps/etc) would not propagate across to the linked Altus Project on refresh. The root cause has been identified and has been resolved. 🟢Low
Bug #38891 🌞 Restored Protobuf dependency that is being removed from some Microsoft environments.
Use Altus release with this fix:
  • if you encounter error message related to Protobuf during deployment
  • or when users attempt to use the Sync Now button when trying to synchronise Planner Premium schedule (the sync fails and displays an error message).
Version 2025.11.4.3 is a patch to First Release.
Version 2025.11.4.4 is for Canary version that also has all the new features (new Altus Home Page, new Altus Scheduling Engine and Improved Navigation).
Update: As per 11 Nov 2025, version 2025.11.04.3 is promoted to General Availability and 2025.11.04.4 is promoted to First Release.
🟢Low

 


2025.10.21.36

  • Atsumeru - 2025.10.21.5
  • ControlsV1 - 2025.10.21.36
Environment Release Date Status
🚂Canary 28 Oct 2025
🚂First Release 11 Nov 2025
🚂General Availability 25 Nov 2025
 
Item Description
Bug #35215 The formatting of dynamics for dates is now applied on drag of task in Optimisation grid. 🟢Low
Bug #35349 Resolved an issue where the Prioritisation table header was not visible when scrolling many initiatives in the plan. The table headers will now remain visible while scrolling down the initiative list, enhancing user experience and usability. 🟢Low
Bug #35638 Rectified an issue where long transaction type names were cut off in the row totals for Optimisation Finances depending on column size. Long transaction type names will now render with an ellipsis if the content exceeds the space available. 🟢Low
Bug #35668 Upon linking a Project to a Planner Premium or Basic External Schedule will now immediately run a sync. 🟡Medium
Bug #35702 Resolved an issue where scenarios did not switch correctly when a previously unsaved scenario was saved. 🟢Low
Bug #36590 Fixed an issue where opening a project schedule in Teams/SharePoint library prompted a download instead of opening in MS Project. The solution ensures consistent behavior between Card View and List View, allowing files to open directly in MS Project as expected. 🟡Medium

 


2025.10.15.2

  • Atsumeru - 2025.10.15.2
  • ControlsV1 - 2025.10.14.13
Environment Release Date Status
🚂Canary 21 Oct 2025
🚂First Release 28 Oct 2025
🚂General Availability 11 Nov 2025
 
Item Description
Bug #33903 Resolved an issue in Prioritisation where the refreshing the grid and selecting to discard changes was not reverting the Selected Initiatives back to the last saved state. 🟢Low
Bug #35963 When switching optimisation scenarios it not does not cause unsaved state which was due to dependencies persisting between scenario changes. 🟢Low
Bug #36565 Restored the EnforceFieldLock plugin functionality which had been erroneously disabled. Field locks will now be correctly enforced by Altus.
Note: This may have impact on any custom functionality built while the field lock was not correctly being enforced.
🔴High
Bug #36750 External project sync: Resolved an issue where task deletions with dependencies in Planner Premium were not syncing correctly with Altus. Deletion of dependencies during external sync is now working as expected. 🟡Medium

 


2025.10.08.21

  • Kusanagi - 2025.10.08.2
  • Atsumeru - 2025.10.08.7
  • ControlsV1 - 2025.10.08.21
Environment Release Date Status
🚂Canary 14 Oct 2025
🚂First Release 28 Oct 2025
🚂General Availability 11 Nov 2025
 
Item Description
PBI #32255 We've expanded SPM Optimisation to include resource management alongside time and financial planning.

Filter initiatives by role or resources by initiative to identify overallocation early in planning. View proposed variance (planning vs. capacity) and committed variance (committed resources vs. capacity) to prevent overcommitment and make data-driven resource allocation decisions across your portfolio.
🟡Medium
Bug #35520 Linked group security role is correctly applied according to config, resolving a regression affecting projects of EPT other than 'Major Project'. 🟡Medium
Bug #35580 Resolved an issue where timesheet actuals incorrectly indicated new information to import when there were no changes. Rounding according to config is applied earlier in delta comparison between external system and synced records. 🟡Medium
PBI #35770 Altus Copilot has been introduced to improve user productivity by integrating AI features into Status Updates, Risks and Deliverables. AI features can be controlled via a global AI on/off switch, and security role-based controls allow cost management of AI to ensure the correct people get the AI assistance they need. This feature is still opt-in so contact your partner to request this be enabled. 🟢Low
Bug #36494 Resolved an issue where the user picker on the Project Quick Create form failed to filter out disabled users and hit the 5000 record OData query limit, preventing some users from being found. The control now properly filters users, handles large datasets, and displays email addresses for easier identification. 🟡Medium

 


2025.10.08.8

  • Atsumeru - 2025.10.07.4
  • ControlsV1 - 2025.10.08.8
Environment Release Date Status
🚂Canary 8 Oct 2025
🚂First Release 14 Oct 2025
🚂General Availability 28 Oct 2025

This release contains changes in preparation of upcoming new feature.

 


2025.09.30.18

  • ControlsV1 - 2025.09.30.18
Environment Release Date Status
🚂Canary 30 Sep 2025
🚂First Release 14 Oct 2025
🚂General Availability 28 Oct 2025
 
Item Description
PBI #34418 SPM Prioritisation/Initiative Evaluation: The impact score and evaluation points are now visible in both an overall summary card. Totals are shown for each evaluation criteria card, and criteria choice scores now clearly listed for all dropdown options. 🟡Medium
Bug #35926 SPM Optimisation: Resolved an issue where a horizontal scroll bar appeared on the scenario picklist when a scenario had a long name. 🟢Low
Bug #36120 SPM Optimisation: Resolved an issue where users were unable to use the search field after clicking 'Add from Prioritisation' and returning. 🟡Medium
Bug #36160 SPM Optimisation: Resolved an issue where clicking the score field in an open optimisation scenario with a prioritisation model selected would close the scenario. The score breakdown tooltip now displays correctly without closing the scenario. 🟢Low
Bug #36226 We have updated the buttons so that they appear as single line of text vs multi line for Optimisation. Unsave changes windows. 🟢Low

 


2025.09.16.15

  • ControlsV1 - 2025.09.16.15
  • Atsumeru - 2025.09.16.8
Environment Release Date Status
🚂Canary 23 Sep 2025
🚂First Release 30 Sep 2025
🚂General Availability 14 Oct 2025
 
Item Description
PBI #35397 SPM Optimisation: Primary role is now mandatory during resource creation. 🔴High
Bug #35577 We have correctly secured the 'External Schedule Owners' table and the 'Dependencies' table so only authorised users see them in the site navigation. 🟢Low

 


2025.09.09.26

  • ControlsV1 - 2025.09.09.26
  • Kaizen - 2025.09.09.1
  • Atsumeru - 2025.09.09.7
Environment Release Date Status
🚂Canary 16 Sep 2025
🚂First Release 30 Sep 2025
🚂General Availability 14 Oct 2025
 
Item Description
Bug #35520 Linked group security role is correctly applied according to config, resolving a regression affecting projects of EPT other than 'Major Project'. 🟡Medium
Bug #35580 Resolved an issue where timesheet actuals incorrectly indicated new information to import when there were no changes. Rounding according to config is applied earlier in delta comparison between external system and synced records. 🟡Medium
Bug #36163 Resolved an issue where PMO users encountered an error when adding a group to a project. The solution involved updating permissions to ensure PMO users have the necessary access, preventing the error and allowing seamless group creation and linking to projects. 🟢Low
Bug #36202 Resolved an issue where the Altus Product Help Plugin (BETA) was appearing in other applications within the same environment. An additional check has been added, ensuring it no longer shows up in other applications. 🟢Low
Bug #36317 Resolved an issue where projects with names exceeding 100 characters caused errors during Planner sync. The system now supports syncing projects with longer names, ensuring seamless integration and improved user experience. 🟢Low
PBI #36274 Improved outcomes when renaming a project without using Microsoft Teams to avoid the appearance of orphaned documents. The solution now ensures that the project documents folder remains connected and resilient to renaming by using the hidden 'Title' field to establish a consistent link. 🟡Medium

 


2025.09.02.6

  • Atsumeru - 2025.09.02.2
  • ControlsV1 - 2025.09.02.6
Environment Release Date Status
🚂Canary 2 Sep 2025
🚂First Release 16 Sep 2025
🚂General Availability 30 Sep 2025
 
Item Description
PBI #36131 Introduced a new 'Days' input option in the Resource Plan, allowing users to enter requests in days, which is then automatically converted to hours based on the default calendar. This enhancement provides a more intuitive interface for planners who think in terms of days rather than hours, ensuring consistency with existing hour-based calculations. 🟡Medium

 


2025.08.26.11

  • ControlsV1 - 2025.08.26.11
  • Atsumeru - 2025.08.26.8
Environment Release Date Status
🚂Canary 26 Aug 2025
🚂First Release 2 Sep 2025
🚂General Availability 16 Sep 2025
 
Item Description
PBI #33653 Enhanced the Gantt chart's zoom and pan functionality which was inconsistent. The zoom now defaults to the horizon start marker and allows horizontal scrolling across the timeline, ensuring a smooth and predictable user experience. 🟢Low
PBI #35840 To enhance strategy reporting, a new custom lookup field named 'Primary Goal' was added to the Project table. As needed for your scenario it can be added to the form. 🟢Low
PBI #35882 We have implemented a custom theme for Altus. It is set at the app level and if required can be overwritten by creating a solution layer on top of the internal label 'sensei_CustomTheme'.
Partners can also manage themes for clients directly in their environment, giving full flexibility for a tailored look and feel.
For setup details, see Microsoft’s guide: https://learn.microsoft.com/en-us/power-apps/maker/model-driven-apps/modern-theme-overrides
🟢Low

 


2025.08.19.5

  • Atsumeru - 2025.08.18.5
  • ControlsV1 - 2025.08.19.5
Environment Release Date Status
🚂Canary 19 Aug 2025
🚂First Release 2 Sep 2025
🚂General Availability 16 Sep 2025
 
Item Description
PBI #31635 You can now bulk-add initiatives from one or more Prioritisation plans directly into your Optimisation scenario. This streamlines setup and ensures alignment across planning workflows.
screenshot
screenshot
🟡Medium
PBI #32822 Ensure colour consistency of initiative types across Optimisation and Timeline controls. 🟢Low
PBI #33064 Altus Explorer has been renamed to All Active Projects - Timeline. This change enhances clarity by providing a more descriptive name for the feature, making it easier for users to understand its purpose and usage. The renaming has been applied across various views including Project List, Portfolio, and Program. 🟡Medium
PBI #35426 We have resolved the delays experienced during the initial API calls by implementing a warm-up process. Now, the Scheduling API and ABD API are pre-initialized on application start, reducing the likely hood of an initial long loading time on first load. 🟢Low
NFI #35771 A new Kusanagi bundle has been created in the PCF.Controls repository to improve the management of JavaScript assets. This update addresses the issue of the growing size of the existing bundles by introducing a dedicated bundle for Kusanagi UX JavaScript, resulting in a more efficient and manageable deployment. 🟢Low
NFI #35900 Updated Entity Relationship Diagram in Docs As built documentation. 🟢Low

 


2025.08.14.7

  • ControlsV1 - 2025.08.14.7
Environment Release Date Status
🚂Canary 15 Aug 2025
🚂First Release 19 Aug 2025
🚂General Availability 2 Sep 2025
 
Item Description
Bug #35841 Resolved an issue where the Timesheet and Resource Sync was not functioning. The sync process now works seamlessly, ensuring accurate and timely updates. 🟢Low

 


2025.08.12.33

  • Atsumeru - 2025.08.06.4
  • Kaizen - 2025.08.06.1
  • ControlsV1 - 2025.08.12.33
Environment Release Date Status
🚂Canary 12 Aug 2025
🚂First Release 19 Aug 2025
🚂General Availability 2 Sep 2025
 
Item Description
PBI #32872 Implemented ability to turn off the initiative evaluation tab for any initiative type via the Strategy > General Settings configuration setting. 🟢Low
Bug #35574 Resolved a bug in the External Task Sync Health Check flow which did not account for the architectural changes specific to Planner Premium and thus was mistakenly attributing its tasks to be deleted. 🟢Low

 


2025.08.05.15

  • ControlsV1 - 2025.08.05.15
Environment Release Date Status
🚂Canary 5 Aug 2025
🚂First Release 19 Aug 2025
🚂General Availability 2 Sep 2025
 
Item Description
PBI #33519 Optimisation - Finance grid now accurately distributes proposal costs evenly across the duration of the proposal when configured. 🟡Medium
PBI #33757 In Optimisation, when not simulating a distribution of Proposal costs, if the proposal is scheduled outside of the horizon dates, then revert horizonForecast value to 0. When simulating a distribution of Proposal costs, horizon forecast value should reflect the portion of the distributed financials that falls within the horizon window. 🟢Low

 


❄️ 2025.08.05.9

  • ControlsV1 - 2025.08.05.9
  • Atsumeru - 2025.08.05.4
Environment Release Date Status
🚂Canary 5 Aug 2025
🚂First Release 5 Aug 2025
🚂General Availability 19 Aug 2025
 
Item Description
Bug #35618 Various important fixes for the Optimisation feature (#35649, #35646, #35637 ) 🟢Low
Bug #26105 Resolved an issue where the tooltip for the timesheet to finance import was off due to a rounding error. The rounding issue has been fixed, ensuring accurate tooltip values. No changes to raw financial values. 🟢Low
Bug #35617 Fixed SSRF vulnerability in Planner Premium Sync custom API by validating cryptographic authenticity of supplied token. Reported by 'Division 5'. While this issue had no potential for customer data leakage, it is addressed for completeness. 🟢Low

 


❄️ 2025.08.01.X

  • Atsumeru - 2025.08.01.10 (First Release)
  • Atsumeru - 2025.08.01.13 (Canary)
Environment Release Date Status
🚂Canary 1 Aug 2025
🚂First Release 1 Aug 2025
🚂General Availability 19 Aug 2025
 
Item Description
Bug #35584 Resolved an issue where the Planner Premium Sync failed due to a missing end of central directory record. The solution involved ensuring rectifying incompatible compression algorithms. 🟢Low

 


2025.07.29.33

  • Atsumeru - 2025.07.29.4
  • Kaizen - 2025.07.23.1
  • ControlsV1 - 2025.07.29.33
Environment Release Date Status
🚂Canary 30 Jul 2025
🚂First Release 5 Aug 2025
🚂General Availability 19 Aug 2025
 
Item Description
PBI #32255 Optimisation - Now Available in Altus!

We are excited to introduce our Strategic Portfolio Management Optimisation feature - where you can conduct scenario planning and optimise your portfolio for impact.
This is for Portfolio Managers, Departmental leads who need speed and confidence.
Perfect for scenarios where you need to:
  • Build confidence in portfolio decisions with objective analysis.
  • Show leadership clear trade-offs and optimal allocation.
  • Handle complexity that spreadsheets can't manage effectively.
No matter where you're at:
Starting early → Build optimal portfolios before priorities are set.
Executing strategy → Convert priorities into deliverable plans within constraints.
The result: Fast, reliable portfolio optimisation that moves you from analysis paralysis to confident action.

screenshot

Need help? Check out our documentation here.
🟡Medium
Bug #33104 Updated Full Screen control component to truncate titles which would otherwise overrun into multiple lines. A tooltip will be displayed to show the full title. 🟢Low
NFI #35380 Moved sensei_SenseiProject.bundle.js from SenseiProject to SenseiControlsV1 solution for quicker deployment times - NOTE: If you have added a customisation layer to this file (unsupported) it will no longer be at the top (effective). 🟡Medium
PBI #33983 Altus has streamlined the strategic planning process by enabling users to create an Optimisation scenario directly from the Prioritisation screen. Optimisation feature enables you to find the best mix of initiatives to maximise strategic value within your budget and timeline constraints, while enabling scenario planning to identify the optimal portfolio for your organisation. 🟡Medium
Bug #35433 Resolved Error on trying to load the Resource Plan. "End of Central directory record could not be found." 🟡Medium
Note

This release contains updates to security roles. If your installation utilises custom security roles instead of the provided Altus security roles then further testing of this release may be necessary.

Security roles updated in this release:

  • Altus - Strategy Executive
    • Added Append, AppendTo and Read for sensei_proposal

 

2025.07.22.2

  • Atsumeru - 2025.07.21.1
  • Kaizen - 2025.07.22.1
  • ControlsV1 - 2025.07.22.2
Environment Release Date Status
🚂Canary 22 Jul 2025
🚂First Release 5 Aug 2025
🚂General Availability 19 Aug 2025
 
Item Description
Bug #34803 Resolved an issue where the Status Summary Control was not updating in real-time. The Control now refreshes automatically when new records are added or existing records are deleted, ensuring accurate and up-to-date information is displayed on the register tabs. 🟡Medium

 


2025.07.16.7

  • Atsumeru - 2025.07.16.7
  • Kaizen - 2025.07.16.2
  • ControlsV1 - 2025.07.16.4
Environment Release Date Status
🚂Canary 16 Jul 2025
🚂First Release 22 Jul 2025
🚂General Availability 5 Aug 2025
 
Item Description
PBI #29847 A new optional menu item "Open Details" has been added to the timesheet row context menu, allowing users to open the default form. This can be enabled by toggling the Timesheet > General Settings > Allow selection to Edit Timesheet Row via Default Form to on in the Settings menu. 🟢Low

 


🌶️ HOTFIX: 2025.07.16.X

  • Atsumeru - 2025.07.16.2 (GA)
  • Atsumeru - 2025.07.16.3 (FR)
  • Atsumeru - 2025.07.16.7 (Canary)
Environment Release Date Status
🚂Canary 16 Jul 2025
🚂First Release 16 Jul 2025
🚂General Availability 16 Jul 2025
 
Item Description
Bug #35257 Resolved an issue caused by a Microsoft change to the way ID's are imported by DataFlows. External sync functions were failing due to a missing ID field in the Dataflow. The solution involved configuring the Update plugin steps to include a Post Image of the record, ensuring all necessary properties are available for processing.
If you are having DataFlow issues please ensure you have this update installed.
Hotfix version number is 2025.07.16.2 for GA and 2025.07.16.3 for FR. This fix is also part of the new Canary (2025.07.16.7 for Atsumeru).
🔴High

 


2025.07.08.6

  • Atsumeru - 2025.07.08.2
  • Kaizen - 2025.07.08.1
  • ControlsV1 - 2025.07.08.6
Environment Release Date Status
🚂Canary 8 Jul 2025
🚂First Release 22 Jul 2025
🚂General Availability 5 Aug 2025
 
Item Description
Bug #30989 Fixed an issue where demo data log failed to load lookups for 'sensei_task' and 'sensei_timesheetrow'. The data loader now includes these lookups, ensuring smooth and error-free data loading. 🟢Low
Bug #31977 Resolved 3 issues raised by the Microsoft Solution checker.
When the owner of a Project, Portfolio, or Program is updated, Altus automatically updates ownership across all related items in the hierarchy (e.g. Risks, Issues, Decisions). Microsoft’s Solution Checker identified that these ownership updates were previously handled in an unsupported way, which resulted in 3 critical issues being reported.

Who’s Impacted?
If you’ve customised the plugin Sensei_AttributeOwnershipAndRoles, review your changes. Any customisations need to be removed.

In the future:
Please do not register new plugin steps against this plugin going forward.
🔴High
Bug #33735 Addressed an issue within Prioritisation and Dependency selection, where an error was displayed to the user if they did not have permission to see a given initiative type. The system now ensures that users only see tabs and options they have access to. 🟢Low
Bug #33997 Fixed an issue where Altus Explorer's full screen mode in Portfolios and Programs displayed the grid in proportion to its original screen size. The grid now fully utilises the screen space. 🟢Low
Bug #34760 Addressed an issue where some field values were blank in the Altus Explorer in the Portfolio and Program projects tab view. 🟢Low
Bug #34804 Resolved an issue where the Resource Plan could go non-responsive when importing resource data from Altus for Project. The solution ensures that the Resource Plan now loads as expected, providing a seamless experience for users. 🟢Low

 


2025.07.01.16

  • Kaizen - 2025.07.01.3
  • ControlsV1 - 2025.07.01.16
Environment Release Date Status
🚂Canary 1 Jul 2025
🚂First Release 8 Jul 2025
🚂General Availability 22 Jul 2025

This release contains changes in preparation of upcoming new feature.

 


2025.06.24.11

  • Atsumeru - 2025.06.24.4
  • Kaizen - 2025.06.24.5
  • ControlsV1 - 2025.06.24.11
Environment Release Date Status
🚂Canary 24 Jun 2025
🚂First Release 8 Jul 2025
🚂General Availability 22 Jul 2025
 
Item Description
Bug #30448 Resolved an issue where project ownership changes were not propagating to associated Buckets. Now, when a project is linked to a Group, the ownership of all associated Buckets is correctly updated to reflect the new project owner. 🟢Low
Bug #33158 Fixed an issue with the SmartPaste feature not functioning on Proposals, Portfolios, Ideas, Programs and Resources. A comprehensive list of compatible and non-compatible forms is available at AI for Altus in Altus Docs. 🟡Medium

 


❄️ 2025.06.18.19

  • Atsumeru - 2025.06.17.7
  • Kaizen - 2025.06.18.4
  • ControlsV1 - 2025.06.18.19
Environment Release Date Status
🚂Canary 18 Jun 2025
🚂First Release 24 Jun 2025
🚂General Availability 8 Jul 2025
 
Item Description
Bug #33913 Rectified some UI bugs caused by the External Project and Group Dialog changes. Normal testing is recommended to check if these fixes have issues with customisations specific to your organisation. 🟡Medium
Bug #33933 ❄️ Resolved an issue where the Create and Cancel button outlines were missing on the new project creation pane. Before implementing this change to Production, please test if Project creation works as expected in your environment. 🟡Medium

 


2025.06.17.10

  • Atsumeru - 2025.06.17.5
  • Kaizen - 2025.06.17.1
  • ControlsV1 - 2025.06.17.10
Environment Release Date Status
🚂Canary 17 Jun 2025
🚂First Release 24 Jun 2025
🚂General Availability 8 Jul 2025
 
Item Description
Bug #24102 Addressed an issue where selecting a non-Altus user as a Project Manager could result in an unclear error. While the system cannot restrict the list to Altus users only, improved error messaging has been implemented to clearly inform users when an invalid selection is made. 🟢Low
Bug #33512 Resolved an issue where the Microsoft Copilot feature was visually blocking the External Project Link and the Group Buttons for Projects. The solution ensures that all buttons are now accessible without overlap, enhancing user experience and functionality. Project Settings widget
More information on Smart paste can be found here.
🔴High
Bug #33732 Resolved an issue where the Microsoft Copilot feature was visually blocking the Group Buttons on Programs. The solution ensures that all buttons are now accessible without overlap, enhancing user experience and functionality. Program Settings widget
More information on Smart paste can be found here.
🔴High
Bug #33733 Resolved an issue where the Microsoft Copilot feature was visually blocking the Group Buttons on Portfolios. The solution ensures that all buttons are now accessible without overlap, enhancing user experience and functionality. Portfolio Settings widget
More information on Smart paste can be found here.
🔴High
Bug #33763 Rectified an alignment issue with placeholder text in Prioritisation module. The "Select Initiative" label is now always centered.
Before:
screenshot
After:
screenshot
🟢Low
Bug #33764 Addressed an issue where the start and finish date format in Altus Explorer didn't fully comply with the users settings, even though the tooltip did. 🟢Low
Bug #33793 An issue was discovered whereby Projects which had an Agile Project Type would not have the Current Stage column update correctly as the Project traversed the business process flow. This has now been rectified. 🟢Low

 


2025.06.06.15

  • Kaizen - 2025.06.06.4
  • ControlsV1 - 2025.06.06.15
Environment Release Date Status
🚂Canary 10 Jun 2025
🚂First Release 24 Jun 2025
🚂General Availability 8 Jul 2025
 
Item Description
Bug #33523 Resolved an issue in Prioritisation module, where customers with an existing field on projects/proposals or ideas with an internal name ending in "_initiative" would confuse prioritisation and initiative evaluations. Altus has now been updated to look for our initiative field first before looking for custom ones. 🟢Low

 


2025.06.03.24

  • Atsumeru - 2025.06.03.1
  • Kaizen - 2025.06.03.5
  • ControlsV1 - 2025.06.03.24
Environment Release Date Status
🚂Canary 3 Jun 2025
🚂First Release 10 Jun 2025
🚂General Availability 24 Jun 2025
 
Item Description
Bug #31042 The "Display Greyscale Past Forecast and Future Actuals" in Finance settings is designed to visually indicate which values contribute to variance calculations by greying out past forecast values and future actuals.
A recent regression caused this greyscale styling to appear only in the totals row, while the individual item-level values remained unhighlighted.
This issue has now been resolved, greyscale cues are correctly applied across all relevant values in the financial grid.
screenshot
🟢Low
Bug #32952 Fixed UI misalignments of labels in the Prioritisation view when there was no Prioritisation Model selected or when there was a Prioritisation Model selected but not initiatives added. 🟢Low
PBI #33125 Projects connected to External Systems can now be set so that assignments can be managed in Altus, giving project managers more control over task assignments. This enhancement allows for manual assignment management while still receiving tasks from external systems. This improvement ensures that users can timesheet against these tasks effectively.
An external system can now be set so that the resource assignments can be managed manually by Project Managers. When this setting is set Altus will no longer automatically create resource assignments based on the source system and it is up to the project manager to set this. This change will allow them to manage resource assignments only through the Gantt. For more information on this item, click here.
🟡Medium

 


2025.05.28.11

  • Atsumeru - 2025.05.28.1
  • Kaizen - 2025.05.28.1
  • ControlsV1 - 2025.05.28.11
Environment Release Date Status
🚂Canary 28 May 2025
🚂First Release 10 Jun 2025
🚂General Availability 24 Jun 2025
 
Item Description
Bug #31684 The Group picker now detects if the assigned team/group is of an unsupported type. If so, it will inform users and suggest that they should reset the ownership of the record.
Changes are localised to the Entity Group Owner PCF control.
🟢Low
Bug #31975 Fixed an issue with timesheet to finance sync.

Old behaviour:
If a timesheet is recalled after having been approved and the corresponding finance data imported to the schedule, when the timesheet to finance sync is run again, the previously approved time remains after the sync is run.

New behaviour:
If a timesheet is recalled after having been approved and the corresponding finance data imported to the schedule, when the timesheet to finance sync is run again, the removal of the previously approved financial transactions will be detected and offered as an importable change.

These changes are localised to the Timesheet to Finance Service in the Data Ingestion Assembly.
🟡Medium
Bug #33091 Fixed an issue where some columns were not displaying correctly in the Altus Explorer.
  • Date columns were not rendering in the grid on the left.
  • Multi line fields were not displaying correctly in cell tooltips.
  • Cell tooltips were not formatted properly as per user settings.
Changes are all localised to the Altus Explorer PCF.
🟢Low
Bug #33475 When creating a dependency between two projects, a scenario was fixed where the user creating the dependency does not have adequate permissions.
Change is localised to the Dependency-NameBackfill workflow.
🟢Low
Bug #33477 An issue was rectified for Bookable Resource that forced an end date to be entered if a start date was entered.
Changes are localised to the StartandFinishValidation workflow.
🟢Low

 


🌶️ HOTFIX: 2025.05.26.11

  • ControlsV1 - 2025.05.26.11
Environment Release Date Status
🚂Canary 26 May 2025
🚂First Release 26 May 2025
🚂General Availability 26 May 2025
 
Item Description
Bug #33472 Resolved sync frequency for integration with Planner Basic and Planner Premium. 🟡Medium
Bug #33479 Fixed sync issue with Planner Basic integration. 🟡Medium

 


❄️ 2025.05.23.1

  • Atsumeru - 2025.05.23.1 ❄️ COOLFIX ❄️
Environment Release Date Status
🚂Canary 23 May 2025
🚂First Release 27 May 2025
🚂General Availability 10 Jun 2025
 
Item Description
Bug #33460 ❄️ Restore missing links and badges to Dependencies view (Grid Cell Renderer). 🟢Low

 


2025.05.20.2

  • Atsumeru - 2025.05.19.4
  • Kaizen - 2025.05.20.2
  • ControlsV1 - 2025.05.19.3
Environment Release Date Status
🚂Canary 20 May 2025
🚂First Release 27 May 2025
🚂General Availability 10 Jun 2025
 
Item Description
Bug #31186 Date validation controls have been added to Benefits, Program, and Proposals to prevent start dates from being set after finish dates, and vice versa. 🟢Low
Bug #32347 The "Assign" button has been removed from the command bar when viewing a project within a Program or Portfolio, to prevent ownership changes from those contexts. 🟢Low
Note

This release contains updates to security roles. If your installation utilises custom security roles instead of the provided Altus security roles then further testing of this release may be necessary.

Security roles updated in this release:

  • Altus - PMO User
  • Altus - Portfolio Manager - Team
  • Altus - Program Manager
  • Altus - Program Manager - Team
  • Altus - Strategy Executive
  • Altus Admin User
  • Altus Portfolio User
  • Altus Project Executive
  • Altus Project User
  • Altus Strategy User

2025.05.13.7

  • Atsumeru - 2025.05.13.7
  • Kaizen - 2025.05.13.2
  • ControlsV1 - 2025.05.13.7
Environment Release Date Status
🚂Canary 13 May 2025
🚂First Release 27 May 2025
🚂General Availability 10 Jun 2025
 
Item Description
PBI #28284

Introducing Inter-Project Dependencies

The new Inter-Project Dependencies feature allows you to visualise and manage dependencies across your entire portfolio or program.

This feature helps you:

  • Understand how project timelines align.
  • Spot risks and blockers early.
  • See how delays in one project could impact others.
  • Get a complete picture of your project flow - all in one place.

Inter-Project Dependency lines can be viewed on the All Projects Gantt view and the Projects tab in the Portfolio and Program records.

screenshot

Need help? Check out our documentation here.

Note: if your organisation already has custom Dependencies module, this new release will cause both to appear. An organisation can choose to use existing custom module (some configuration work might be required to hide the new out-of-the-box feature), or start using this new feature.

For more detail on how to configure Interproject Dependencies click here.

Click here to access the As Built documentation for this feature.

🟡Medium
PBI #31933 Performance improvements on Altus Explorer loading time. 🟢Low
Bug #32940 Logging to sensei_businessprocessflowlog has been restored. Project Status Report will again accurately report the current stage of projects. 🟡Medium
Bug #33007 Addressed an issue with the Altus Explorer when adding a currency field to the view would break the control. 🟢Low

 


2025.05.06.14

  • Kaizen - 2025.05.06.1
  • ControlsV1 - 2025.05.06.14
Environment Release Date Status
🚂Canary 6 May 2025
🚂First Release 13 May 2025
🚂General Availability 26 May 2025
 
Item Description
NFI #28922 Performance improvements on Prioritisation module. 🟢Low
Bug #32172 Updated the Project/Program/Portfolio Owner Group settings descriptions and defaults to make the security role setting more accurate.
Note that if the setting is blank, even if the role propagation is disabled, Altus will apply the default role to the selected group. This is due to the group needing some role that will provide access to the selected record.There is no functional change as part of this item.
🟢Low

 


2025.04.29.6

  • Atsumeru - 2025.04.23.2
  • Kaizen - 2025.04.29.1
  • ControlsV1 - 2025.04.29.6
Environment Release Date Status
🚂Canary 29 Apr 2025
🚂First Release 13 May 2025
🚂General Availability 26 May 2025
 
Item Description
Bug #31862 Updated P4TW Dataflows to correct issue with incorrectly calculated project completion in some circumstances. 🟢Low
Bug #32814 Resolved an issue that caused the Change Summary Visual to not update correctly in some cases when Change Requests are deleted. 🟢Low

 


2025.04.22.6

  • Kaizen - 2025.04.22.2
  • ControlsV1 - 2025.04.22.6
Environment Release Date Status
🚂Canary 22 Apr 2025
🚂First Release 29 Apr 2025
🚂General Availability 13 May 2025
 
Item Description
Bug #32816 Fixed an edge case scenario with Scheduled Finish date roll up refresh. 🟢Low

 


2025.04.15.8

  • Atsumeru - 2025.04.11.4
  • Kaizen - 2025.04.15.2
  • ControlsV1 - 2025.04.15.8
Environment Release Date Status
🚂Canary 15 Apr 2025
🚂First Release 29 Apr 2025
🚂General Availability 13 May 2025
 
Item Description
NFI #30187 Upgrade Altus Graph Authentication to use Microsoft Authentication Library (MSAL). 🟢Low
Bug #32117 Change Request Summary Visual now only requires the Change Request Name column. Other columns like Priority, Status, and Cost Estimate are now optional and can be safely removed if required. 🟢Low

 


❄️ 2025.04.10.12

  • ControlsV1 - 2025.04.10.12 ❄️ COOLFIX ❄️
Environment Release Date Status
🚂Canary 10 Apr 2025
🚂First Release 15 Apr 2025
🚂General Availability 29 Apr 2025
 
Item Description
Bug #32380 ❄️ Fixed a regression issue with program status update regarding the schedule baseline. 🟢Low
Bug #32381 ❄️ Fixed a regression issue in canary which broke the risk matrix filters. 🟢Low

 


2025.04.08.17

  • Atsumeru - 2025.04.08.4
  • Kaizen - 2025.04.08.5
  • ControlsV1 - 2025.04.08.17
Environment Release Date Status
🚂Canary 8 Apr 2025
🚂First Release 15 Apr 2025
🚂General Availability 29 Apr 2025
 
Item Description
Bug #24728 Fixed an issue in the availability heatmap where resources with no requests don't update their availability when the input mode is updated. 🟢Low
PBI #30298 If you have Transaction types other than Cost and Budget, you can now create new Transaction types in your Financials and have them displayed in the Financial grid in Projects. For more information click here. 🟡Medium
Bug #30799 Fixed issue with schedule KPI calculation in Program status report. 🟡Medium
PBI #30805 Suggest ideas to our new Roadmap portal and access the Product Roadmap from Altus. We have updated the Feedback button (top right corner of Altus) to connect it to our new Roadmap portal. 🟢Low
Bug #30844 Allocation view for bookable resources - Availability will now display in the grid totals row in addition to the tooltip. 🟢Low
Bug #31187 Addressed an issue where the Prioritisation model would be shown as changed after opening an associated Evaluation Criteria from the grid. 🟢Low
Bug #31192 Addressed an issue where intermittently an Evaluation Criteria (from Prioritisation feature) will show as modified when in fact it had not. 🟢Low
Bug #31661 Fixed an issue causing Duplicate Status Update to cause an error if the configuration setting is empty or invalid. 🟢Low
Bug #31662 Fixed an issue where Duplicate Status Update uses default values in setting instead of user-configured setting. 🟢Low
NFI #31908 Added a check to reject tasks without an External Task ID or External Project ID before moving data from the delta table to the task sync table, ensuring data integrity. 🟢Low

 


2025.04.01.4

  • Atsumeru - 2025.04.01.4
  • Kaizen - 2025.03.31.2
  • ControlsV1 - 2025.03.31.8
Environment Release Date Status
🚂Canary 1 Apr 2025
🚂First Release 15 Apr 2025
🚂General Availability 29 Apr 2025
 
Item Description
PBI #24443 Added timestamps to Altus plugins. 🟡Medium
Bug #30726 Fixed an inconsistency where a user, that didn't have Delete permission, could still see the "Delete" button on Portfolio and Programs but then, when clicking on "Delete" was raising an error pop-up message due to restricted permissions. The "Delete" button is now hidden when the user doesn't have the appropriate permission. 🟢Low
Bug #31026 We have made an improvement on consistency in the top command bar when creating a new record. When creating a new record, the Delete button is hidden until the record is saved. This has been applied to the following records: Goals, Themes, Benefits, Programs, Portfolio, Ideas, Proposals, Challenges, Prioritisations, Evaluation Criteria, Evaluation Criteria Categories, Prioritisation Models. 🟢Low

 


❄️ 2025.03.27.1

  • ControlsV1 - 2025.03.27.1 ❄️ COOLFIX ❄️
Environment Release Date Status
🚂Canary 27 Mar 2025
🚂First Release 1 Apr 2025
🚂General Availability 15 Apr 2025
 
Item Description
Bug #31777 Fixed a decimal precision issue occurring on the Summary Widget of the Financial tab in a Project. The issue was that the decimal precision was not taken into account in the settings when the value had no currency (nor percentage) resulting on the number displaying in the widget always displayed with two decimals. 🟡Medium
Bug #32131 ❄️ Improved stability in Settings. 🟢Low

 


2025.03.25.1

  • Kaizen - 2025.03.25.1
Environment Release Date Status
🚂Canary 25 Mar 2025
🚂First Release 1 Apr 2025
🚂General Availability 15 Apr 2025
 
Item Description
Bug #30554 When the Variance in Financial Setting was turned off, the variance calculation descriptor text below the financial grid in a Project was still showing. This is now fixed and the descriptor is hidden if the Variance is off. 🟢Low
Bug #30956 Fixed an issue where the % progress of the task was not updating the % progress of the project. The issue was happening only when the effort was null and the %progress was entered via the Edit form (not from the inline grid view). 🟢Low
Bug #31593 Resolved an issue in the Financial Grid on Project whereby group rows and at year level, Actual total rows did not always correctly reflect the underlying financial data total when the underlying data should sum-up to 0. This issue was happening on very particular set of data and has been seen only once. 🟢Low

 


2025.03.18.1

  • Atsumeru - 2025.03.13.8
  • Kaizen - 2025.03.18.1
  • ControlsV1 - 2025.03.17.11
Environment Release Date Status
🚂Canary 18 Mar 2025
🚂First Release 1 Apr 2025
🚂General Availability 15 Apr 2025
 
Item Description
Bug #31166 Resolved performance issue when loading the Altus scheduler under specific circumstances. When viewing a project with sufficient task and resource assignment numbers it was possible to make the browser hang and/or thus avoiding such browser issues. 🔴High
Bug #31943 A scenario was identified by a client whereby a planner basic project was not able to synchronise correctly. The specific scenario which caused this issue was as a result of using the "Copy Plan" option within the Planner UI. This has now been rectified and planner basic projects now synchronise correctly as a result. 🟡Medium
Note

This release contains updates to security roles. If your installation utilises custom security roles instead of the provided Altus security roles then further testing of this release may be necessary.

Security roles updated in this release:

  • Altus - PMO User
  • Altus - Portfolio Manager - Team
  • Altus - Program Manager
  • Altus - Program Manager - Team
  • Altus - Strategy Executive
  • Altus Admin User
  • Altus Portfolio User
  • Altus Project Executive
  • Altus Project User
  • Altus Strategy User

❄️ 2025.03.14.4

  • Atsumeru - 2025.03.13.7 ❄️ COOLFIX ❄️
  • Kaizen - 2025.03.11.4
  • ControlsV1 - 2025.03.14.4 ❄️ COOLFIX ❄️
Environment Release Date Status
🚂Canary 14 Mar 2025
🚂First Release 18 Mar 2025
🚂General Availability 1 Apr 2025
 
Item Description
Bug #31915 ❄️ Fixed an issue due to Altus Explorer development: when a project was created from a Portfolio, the associated Portfolio was not appearing on the Project. 🟢Low
Bug #31919 ❄️ Resolved an issue preventing Altus Explorer from loading more than 50 projects. The limit is now extended to 5000 projects. 🟢Low

 


2025.03.11.9

  • Atsumeru - 2025.03.11.7
  • Kaizen - 2025.03.11.4
  • ControlsV1 - 2025.03.11.9
Environment Release Date Status
🚂Canary 12 Mar 2025
🚂First Release 18 Mar 2025
🚂General Availability 1 Apr 2025
 
Item Description
PBI #30801

Introducing Altus Explorer (Beta) – A More Visual and Intuitive Project View

Say goodbye to static project lists! With Altus Explorer, we’re bringing a more visual and structured way to manage your projects.

💡 What's new?
✔️ Hierarchical view – See projects grouped by Portfolio and Program instead of a flat list.
✔️ Integrated Gantt chart – Track project schedules and progress visually.
✔️ Enhanced filtering – Quickly find projects, even when they belong to a program but are part of a portfolio.
✔️ Better executive reporting – Reduce manual work by having a clear, structured view.

This new view will help you navigate projects more efficiently, making it easier to manage schedules, track progress, and provide executive-friendly visuals — all in one place.

Access Altus Explorer from Projects:
Click on "Projects" and select the "Altus Explorer" View 
screenshot

Short Video Overview of Altus Explorer here.
Need help? Check out our documentation here.

Note: when trying to use Altus Explorer on 5000 projects rows (Altus Explorer View is only filtered on Active Projects), the loading time of the page may exceed 40 seconds. Please try to use Altus Explorer on filtered views. Altus Explorer is currently a Beta version and we will soon improve the loading time performance. Rest assured, the performance is reasonable for 1000 projects (8 seconds to load), and 4 seconds for 500 projects.

Update 19 Aug 2025: Altus Explorer is now renamed to "All Active Projects - Timeline" view.

🟢Low
PBI #31199

Enhanced Onboarding & Guidance in Altus (Beta)

To improve user experience and streamline onboarding, altus now includes new in-app guidance and support features. These enhancements provide users with easy access to information, ensurig they can navigate the platform more effectively.

New Capabilities:

  • Help Center within Altus – Users can now search for articles, access training materials, and use AI-powered assistance to find answers without leaving the platform.
  • Feature Highlights on Login – A pop-up notification will display key updates and newly released features when users log into Altus for the first time.
  • Interactive Information bubbles – Clicking on an info icon provides a short video or a direct link to relevant documentation.
  • Step-by-Step Interactive Guides – Walkthroughs are available to guide users through new features and workflows.

Notes:

  • Data Privacy: All interactions are anonymised, and Altus does not store any customer data.
  • Standardised Content: Guidance elements are not customisable by partners nor customers.
  • Trial Phase: This new onboarding experience is currently available for the Prioritisation module as we evaluate its effectiveness.

These improvements aim to enhance usability and user adoption. We welcome your feedback as we continue refining the experience.

Short Video Overview of new Onboarding Experience here.
Need help? Check out our documentation here.

🔴High
Bug #31594 Addressed an issue in resourcing where the contour of the proposed hours was being honoured for a committed hours change, however due to calendar exceptions being introduced, had put a large negative number on the last day.

Note: when calendar exceptions are introduced currently the proposed hours should be adjusted on the resource plan first, before updating committed. This is due to the contour being honoured despite calendar exception conflicts.
🟡Medium
Bug #31810 Configuration Settings improvements when modifying configuration JSON directly. 🟢Low

 


2025.03.04.2

  • Atsumeru - 2025.03.04.2
  • Kaizen - 2025.02.27.1
  • ControlsV1 - 2025.02.27.1
Environment Release Date Status
🚂Canary 4 Mar 2025
🚂First Release 18 Mar 2025
🚂General Availability 1 Apr 2025
 
Item Description
PBI #27073

Prioritisation - Now Available in Altus!

We’re excited to introduce our new Prioritisation module, designed to help you focus on the right initiatives and drive strategic success.
screenshot


Flexible Prioritisation Models – Define and customise evaluation criteria to fit your strategy.
Enhanced Decision-Making – Prioritise initiatives with clear, transparent scoring.
Improved Resource Allocation – Identify top priorities and allocate resources effectively.
Streamlined Planning – Adjust priorities easily as business needs evolve.

How to use it?

  • Navigate to the Prioritisations in the Strategy Altus area.
  • Score and compare initiatives to make data-driven decisions.

Short Video Overview of Prioritisation here.
Need help? Check out our documentation here.
Want a demonstration? No worries, contact your Account Manager and we will organise something.

Note: As part of the Prioritisation development, we have surfaced the Goals in the left hand side navigation menu. If your organisation has already surfaced it, you may see the "Goals" showing twice in the menu. Therefore, we recommend to check the navigation menu in the Strategy Area.
Prioritisation and Goals might not appear in the Home Page if there are customisations on Strategy panel. You may need to go to Settings > Landing Page and add the Prioritisation and Goals links to improve user experience.
This new feature moves Idea form to Atsumeru layer. Existing customisations on the Idea form might become hidden and should be tested thoroughly. Please contact Client Care team for assistance if needed.

🔴High
Bug #30285 Improved Bookable Resource form by adding date validation. 🟢Low
Bug #31609 Resolved a Finance Grid issue where adding budget via period total cell does not add Budget to the grid until we click refresh. 🟢Low
Bug #31610 Resolved a Finance Grid issue where adding forecast/ actual via period total cell does not add Cost to the grid until we click refresh. 🟢Low
Bug #31657 Fixed an issue with Reset Setting. 🟢Low

 


2025.02.25.10

  • Atsumeru - 2025.02.19.4
  • Kaizen - 2025.02.25.4
  • ControlsV1 - 2025.02.25.10
Environment Release Date Status
🚂Canary 25 Feb 2025
🚂First Release 4 Mar 2025
🚂General Availability 18 Mar 2025
 
Item Description
Bug #28505 The Teams & Channels creation process has been improved, with the Documents tab now intelligently matching and storing existing channel information when none is initially set, enhancing overall reliability and efficiency. 🟢Low
Bug #31083 We fixed the issue when an error pop-up was appearing when trying to duplicate a Status Update and the previous status update have blank KPI Status. 🟢Low

 


2025.02.19.3

  • Atsumeru - 2025.02.19.3
  • Kaizen - 2025.02.18.2
  • ControlsV1 - 2025.02.18.6
Environment Release Date Status
🚂Canary 19 Feb 2025
🚂First Release 4 Mar 2025
🚂General Availability 18 Mar 2025
 
Item Description
Bug #26654 Fixed issue with tasks not properly deleting when unlinking a project. All project unlinking is now done client side. 🟢Low
NFI #30778 Resolved some deployment issues caused by Microsoft removing FluentThemingPreview app setting. ⚪None
Bug #31260 Fixed the alignment of the Project Names on the Project List views. 🟢Low

 


❄️ 2025.02.19.2

  • Atsumeru - 2025.02.19.2 ❄️ COOLFIX ❄️
Environment Release Date Status
🚂Canary 19 Feb 2025
🚂First Release 19 Feb 2025
🚂General Availability 4 Mar 2025
 
Item Description
Bug #31569 ❄️ Fixed an issue impacting Planner Premium integration task sync caused by some recent changes from Microsoft. 🟢Low

 


2025.02.11.5

  • Atsumeru - 2025.02.19.2
  • Kaizen - 2025.02.11.2
  • ControlsV1 - 2025.02.11.5
Environment Release Date Status
🚂Canary 11 Feb 2025
🚂First Release 19 Feb 2025
🚂General Availability 4 Mar 2025
 
Item Description
PBI #24500

We are excited to announce Enhanced Integration for Planner Premium, which enhances several key areas of the system:

New Project Experience:

  • You can now create Planner Premium projects directly from within Altus.
  • The project creation process has been simplified, allowing you to create Planner and Planner Premium projects without needing to create a group initially. Groups can be created later when collaboration or task assignments are needed.

Upgraded Sync Process:

  • Planner Premium now requires zero setup and is included out of the box with every Altus deployment. It can be disabled in settings if desired.
  • Planner and Planner Premium projects synchronise their data seamlessly whenever the Project Manager navigates to the project, ensuring up-to-date information in just a few seconds.

Timephased Support:

  • When using an Altus project connected to Planner Premium, the timephased features of the Resource Plan, such as Create Plan from Schedule and the Schedule Column, utilise the assignment-by-day information maintained in Planner Premium.

These enhancements are designed to streamline your project management experience, making it more efficient and user-friendly.

Need help? Check out our documentation here.

🟡Medium
Bug #30110 It was reported that resource requests that were approved were not updating with the latest reviewer. i.e., the initial reviewer's name would appear in all subsequent correspondence (notifications/emails/etc.). This has been updated so that each time a resource request is reviewed the name and the date are recorded correctly. 🟢Low
Bug #31039 Fixed a bug causing project form to stop loading inside Teams. 🟡Medium

 


🌞 WARMFIX: 2025.02.10.3

  • Atsumeru - 2025.01.23.5
  • Kaizen - 2025.01.28.1
  • ControlsV1 - 2025.02.10.3
Environment Release Date Status
🚂Canary 10 Feb 2025
🚂First Release 11 Feb 2025
🚂General Availability 19 Feb 2025
 
Item Description
Bug #31082 Addressed an issue that caused certain settings to crash when opening a setting dialog. 🟡Medium
PBI #30960 Adding Column Field lengths to the Altus As Built-guide. See example of Field length column here. ⚪None
Bug #23082 It was reported that Planner synchronization was creating duplicates. This was investigated and found due to some timing issues this could be possible. This has been rectified for Planner. 🟡Medium
Bug #27137 The configuration item Role Field Check was reported to place in incorrect values when using the option Load Defaults this has been resolved so that this does not occur. 🟢Low
Bug #30506 Fixed an issue with Planner synchronisation (client-side) where it might not get initiated on first link in some circumstances. 🟢Low
Bug #30804 Ensured that unlinking Altus for Project or Planner Premium schedules will be able to handle large projects with over 600 tasks without suffering a timeout issue. 🟡Medium
Bug #30897 Addressed an issue where tasks added to the Altus Schedule via the context menu, then resources were assigned prior to save, resulted in an error and the changes lost. 🟢Low
PBI #30301 The Configuration Settings View has been extended to support links both internal and external. A new column is now on the related table where a redirect URL can be specified. If the link is relative and contains Dynamics query string parameters it will be redirected to from the list view, otherwise it will launch in a new tab.

This will prevent the left navigation becoming cluttered and configuration tables can be located via search within the UI.
🟡Medium

 

2025.01.14.8

  • Atsumeru - 2025.01.14.8
  • Kaizen - 2025.01.14.7
  • ControlsV1 - 2025.01.14.6
Environment Release Date Status
🚂Canary 15 Jan 2025
🚂First Release 21 Jan 2025
🚂General Availability 4 Feb 2025
 
Item Description
Bug #29848 When a resource is 100% available but not fully committed, in the Proposed Tooltip (hover over) of resource grid, odd values would be displayed in the "Proposed Availability".
This has been resolved in the Resource Plan and Resource Demand views: in the tooltip of a Proposed cell, "Proposed Availability" calculation is fixed.
🟢Low
PBI #30297 On the project resource plan, we have added a new column that shows the number of scheduled hours in the current project for a resource in the schedule. Based on this information the user can adjust their proposed hours to cover what the effort planned in the schedule.
Group and overall totals will then present the total unique resource schedule hours to ensure you have coverage overall for the resources in your plan.
The scheduled daily hours will be honoured when the proposed hours are changed to ensure the hours match what is scheduled.

Explanatory video.
See more technical details here.

screenshot
🟢Low
PBI #30300 We have enhanced the Settings with improved UI components: Multi column Tables and Rich text description.
Additional columns to Tables in Settings > Landing Page and Information Panel Calculation pages:
screenshot

Enabled rich descriptions via Markdown on Finance General Setting page:
screenshot
🟡Medium
PBI #30443 We have updated the What's New page in Altus to integrate our Product Roadmap.
You can now: view the latest changes in the "Released" Tab, vote on items that are important to you and provide additional insights (vote on any cards in any tab), or submit ideas of features that you would like to see implemented in Altus.
screenshot
🟢Low
PBI #30857 Added new "External Schedule Owners" table for client-side publishing with Altus for Project. 🟢Low
Bug #28852 Addressed Resource Heatmap issue when viewing generic resources in % capacity mode. Generic resources will now report a capacity of 0 consistently, where they were previously either blank or N/A. 🟢Low

 


2024.12.17.6

  • Atsumeru - 2024.12.17.6
  • Kaizen - 2024.12.17.2
  • ControlsV1 - 2024.12.17.5
Environment Release Date Status
🚂Canary 17 Dec 2024
🚂First Release 7 Jan 2025
🚂General Availability 21 Jan 2025
 
Item Description
NFI #13045 Internal improvement (refactor) to consolidate common library that supplies functionality to Altus PCF controls and Kaizen bundle. 🟢Low
NFI #29833 Internal improvement to modernise toolchains in controls project. 🟢Low
Bug #30143 Financial calculations on the Project Status Update were showing errors due to floating point calculations in JavaScript. This has been rectified. 🟢Low

 


2024.12.10.4

  • Atsumeru - 2024.12.06.4
  • Kaizen - 2024.12.06.3
  • ControlsV1 - 2024.12.10.4
Environment Release Date Status
🚂Canary 3 - 10 Dec 2024
🚂First Release 18 Dec 2024
🚂General Availability 7 Jan 2025
 
Item Description
Bug #26856 Status Updates - Adding non-standard KPI options to the Overall KPI list will no longer change previously selected values. 🟢Low
PBI #27781 For the finance grid: we are transitioning to use the out-of-the-box model-driven app form instead of the built-in Altus form. This will enable the use model-driven app features such as business rules, Power FX, custom PCF Controls, Event Handlers and a suite of features not supported by the old form.
This has been enabled by supporting our transaction grid in the model driven form, and can be added to your own forms.
For existing customers, the grid will still use the built-in Altus form if the quick create form is customised and will honour the finance form Altus settings if specific forms are already configured to override the built in one.
Image
🔴High
PBI #29409 Ensure that Milestone tasks are not included in the Assignment By Day output when using the 'Create Plan from Schedule' functionality for a Microsoft Project project. 🟡Medium
PBI #29779 Previously Altus out-of-the-box shipped SSRS Reports (under "Run Reports") are now hidden by default unless they have been customised in an environment by partners or customers.
Should the Reports be required to be shown again, please refer to our documentation on how to make them visible again.
🔴High
Bug #29844 Altus for Teams: Fix potential redirect loop if parameter is missing. 🟢Low
Bug #30294 Addressed an issue with Resource grid where comments column could disappear in some situations. 🟢Low
PBI #30484 We have adjusted the financial item ribbon for 2 purposes. The first is to protect external financial items or items that are partially locked. The second is to declutter the ribbon and remove some buttons deemed to be troublesome or not used. 🟡Medium
Bug #30712 Addressed an issue with form layering on the new finance details form. 🟢Low

 


< Older